Thursday February 3rd I plan to work from 1 to 3 assuming it isn't raining.  We'll finish prepping C1 and start on C2 if the soil is dry enough to work with.  If 3rd grade was unable to plant carrots and turnips on Wednesday, we'll do that as well.  If there is still time left over, we'll work on the fence line trench.

Friday, February 4 looks like it will be a rainy day.  If it is not raining and the soil is workable, I'll be there from 1 to 3 finishing up the weeding work in the two flower beds and prepping the far end of the right bed for herbal and native species donated by Whitted Bowers Farm.

As always, please check the blog for any last minute changes before you come out.  Hope to see you there!!